This master bathroom had a 1500 lb cultured marble tub and the ceiling was collapsing due to no vent in the bathroom as well as the drywall was installed hastily on 2′ center studs. After demolishing everything, the cleanup, smart re-wire, smart vent fan with bluetooth, reroute the plumbing, new 2-stage halo & vanity lighting, LED shower & bath fixture,tile throughout, digital faucet (tells you the temperature, volume & consumption) and free-standing soaking tub. I believe the changes are breathtaking.
This Bathroom Needs HelpEverything Seems ClaustrophobicThe Tub Wouldn’t Go Through The DoorThe Wall Needed To Be RebuiltThe Plumbing Needed To Be MovedI cut The Floor, Routed The Plumbing For The Shower & Installed The Plumbinbg In The Exterior WallHalo Lights InastalledFloating The Mud After Drywall, The Floor Tile Was NextI Pored Leveling Compound To Prepare The Floor64 Sq/Ft Takes Some TimeFloating The Drywall SeamPreparing For TextureTiling The FloorAlmost Done With The FloorOnce I Rewired The Vanity Wall I Patched The Holes & Prepared It For TexturePreparing For GroutThe Floor Is CompleteToilet Flange ReplacedVanity & Faucet InstalledStarting The Wall TileVanity Light & Mirror PrepFinishing The Wall TileVanirty LED InstalledShowerhead & Niche’ LED InstalledMarble Threshold Installed